A place for the Architecture studios of UB and Cornell to organize, access, and share information.
Saturday, October 1, 2011
Site Analysis_Ebbs and Flows
Thursday, September 29, 2011
Site Zoning Regulations
FYI: Below are the zoning regulations set forth by the city of Buffalo for our site which is located in the Downtown Opportunity District:
§ 511-71. DO Downtown Opportunity District.
Sunday, September 25, 2011
Blog Posting Instructions
Posting Instructions and Tips:
-After logging into the blog (market arcade.blogspot.com), to the right of your optional profile photo, click on the blue “New Post” button.
-On the New Post screen, you can input all of the information that you want to share with the blog.
*Make sure to give your post a title (ie. For a board, it may be helpful to title it with a name that describes the broad subject matter and the specific subject matter, such as “Precedent: Crystal Palace”).
*You have the option to add text, photos (by clicking the button with a photo on it from the toolbar in the upper right) and even videos. Your uploaded photos are limited to 8MB per image so you may need to take the image into Photoshop to adjust the resolution of the image to decrease its size. Also, the images must be in .jpg, .gif, .bmp, or .png format to upload correctly.
*It would be helpful to classify your post with a generic topic name (ie. Site analysis, precedents, etc.) in the “Labels for this Post” section at the bottom of the text editor. This will help to organize the posts in the future.
-Before selecting to publish the post, you can preview it by selecting the “Preview” link in the upper right corner of the text editor.
-Once you are done editing, click the orange button that says “Publish Post”.
-Once the post is made, you should be able to access it from the main page of the blog.